Skip to content

Initializing systems

The fleet goes public

--:--:--:---- days, -- hours, -- minutes until launch

Labs

Bench to Field

Research that does not end in hardware does not get funded here. Materials, electrochemistry, sensing, autonomy: all of it is aimed at the field.

01Maturity ladder

Nine gates. No shortcuts.

Every line passes each gate in order. Status is published when it is cleared, never before.

  1. 01Research
  2. 02Concept Development
  3. 03Engineering Development
  4. 04Prototype
  5. 05Validation
  6. 06Pilot
  7. 07Pre-Production
  8. 08Production
  9. 09Deployed

02Status board

Where every line stands.

Codes from our current briefing. A line can hold more than one: a fielded variant and a next-generation one in development.

PN
Produced / Operational
TCR
Transition to Current Readiness
R&D
Research and Development
NF
Near Future
FF
Far Future
CONTR.
Contractual Collaboration
DER
Derived
  1. 01Ground autonomyDefense
    • TCR: Transition to Current Readiness
    • R&D: Research and Development
    • NF: Near Future
  2. 02Counter-UAS and EM effectsDefense
    • PN: Produced / Operational
    • TCR: Transition to Current Readiness
    • R&D: Research and Development
  3. 03Survivability and signatureDefense
    • PN: Produced / Operational
    • TCR: Transition to Current Readiness
    • NF: Near Future
  4. 04Ballistics and effects integrationDefense
    • TCR: Transition to Current Readiness
    • CONTR.: Contractual Collaboration
  5. 05Sensing and C5ISRDefense
    • R&D: Research and Development
    • NF: Near Future
  6. 06Hybrid ISR platformsAerospace
    • R&D: Research and Development
    • NF: Near Future
  7. 07Standoff systemsAerospace
    • TCR: Transition to Current Readiness
    • R&D: Research and Development
    • NF: Near Future
    • CONTR.: Contractual Collaboration
  8. 08Hydrogen fuel cells and PEMEnergy
    • TCR: Transition to Current Readiness
    • R&D: Research and Development
    • NF: Near Future
  9. 09Battery systemsEnergy
    • TCR: Transition to Current Readiness
    • R&D: Research and Development
    • NF: Near Future
  10. 10CPCD: charging and power conversionEnergy
    • PN: Produced / Operational
    • TCR: Transition to Current Readiness
  11. 11Power distribution and drive controlEnergy
    • NF: Near Future
  12. 12Non-invasive subsurface intelligenceGeotech
    • R&D: Research and Development
    • NF: Near Future

03Evidence discipline

Built. Planned. Intended. Never blurred.

Established facts
Existing facilities, built prototypes, validated capability and approved specifications.
Development objectives
Target performance, future architecture and planned industrialization.
Strategic direction
Desired control over technology layers and expansion into further platforms.

04Research lines

Inside the lab.

Click any frame to scan it.

04.1

Perovskite photovoltaic research

Physical and chemical research on perovskite photovoltaic cells.

04.2

Hydrogen fuel cells and PEM

MEA and PEM technologies and hydrogen fuel-cell systems.

04.3

Advanced battery systems

Battery systems research and integration.

Engage

Early ideas welcome. Difficult ones preferred.

Fleet unveiling · public launch

Unveiling soon.

--Days:--Hours:--Minutes:--Seconds

-- days, -- hours and -- minutes until public launch.